Heavy vehicles have been asked to stop to plying through Zaong bridge between Mangkolemba and Longnak since the bridge has “almost damaged”.
Informing this, EE PWD (R&B) Mangkolemba division has appealed for cooperation and cautioned that the department “will not be held responsible if anyone takes the risk”.
RELATED POSTS
View all