{"id":130999,"date":"2015-06-05T01:10:46","date_gmt":"2015-06-05T01:10:46","guid":{"rendered":"http:\/\/151.106.38.4\/2015\/06\/05\/jacob-inspects-tsurang-irrigation-project\/"},"modified":"2015-06-05T01:10:46","modified_gmt":"2015-06-05T01:10:46","slug":"jacob-inspects-tsurang-irrigation-project","status":"publish","type":"post","link":"https:\/\/nagalandpost.net\/index.php\/2015\/06\/05\/jacob-inspects-tsurang-irrigation-project\/","title":{"rendered":"Jacob inspects Tsurang irrigation project"},"content":{"rendered":"<p><img src=\/old_site\/><\/p>\n<div>Parliamentary secretary for irrigation and flood control (I&amp;FC) Jacob Zhimomi accompanied by I&amp;FC secretary Bendangkokba and chief engineer of irrigation and flood control Njilo Kemp along with the field officers of the irrigation and flood control department &nbsp;inspected Tsurang Irrigation Project on June 3.<\/div>\n<div>During his visit, I&amp;FC parliamentary secretary appreciated the progress of work despite difficult working conditions. He also advised the department officials to strictly adhere to design specifications and maintain quality of work.&nbsp;<\/div>\n<div>Jacob requested the surrounding villages to extend full cooperation towards the successful implementation of the project. The project was funded under Non-Lapsable Central Pool of Resource (NLCPR) with a cost of Rs. 1693.32 lakh. The construction work started during 2010-11 and about 80% of the works was completed.&nbsp;<\/div>\n<div>The project head work site, which was originally proposed at Longtho village, under Mokokchung district, has been shifted 12 km upstream between Wozhi and Shihaphumi under Wokha district.&nbsp;<\/div>\n<div>The project consists of 9 m height weir and 43 m span, which will create ponding of 7 km length on the upstream. The project has a potential of multi facet benefits such as pisciculture, eco tourism and providing irrigation facilities for 1138 Ha covering several villages namely Sumito, Khakuthato, Akuhayika under Wokha district and Moyaimti under Mokokchung district.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Parliamentary secretary for irrigation and flood control (I&amp;FC) Jacob Zhimomi accompanied by I&amp;FC secretary Bendangkokba and chief engineer of irrigation and flood control Njilo Kemp along with the field officers of the irrigation and flood control department &nbsp;inspected Tsurang Irrigation Project on June 3. During his visit, I&amp;FC parliamentary secretary appreciated the progress of work [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[679],"tags":[],"class_list":["post-130999","post","type-post","status-publish","format-standard","hentry","category-nagaland-news"],"_links":{"self":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/130999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/comments?post=130999"}],"version-history":[{"count":0,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/130999\/revisions"}],"wp:attachment":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/media?parent=130999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/categories?post=130999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/tags?post=130999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}