{"id":217850,"date":"2020-07-15T22:19:10","date_gmt":"2020-07-15T22:19:10","guid":{"rendered":"http:\/\/151.106.38.4\/2020\/07\/15\/sanuoru-bridge-to-be-completed-in-12-months\/"},"modified":"2020-07-15T22:19:10","modified_gmt":"2020-07-15T22:19:10","slug":"sanuoru-bridge-to-be-completed-in-12-months","status":"publish","type":"post","link":"https:\/\/nagalandpost.net\/index.php\/2020\/07\/15\/sanuoru-bridge-to-be-completed-in-12-months\/","title":{"rendered":"Sanuor\u00fc bridge to be completed in 12 months"},"content":{"rendered":"<p><img src=\/old_site\/2020_7$large_breingeo.jpg><\/p>\n<p>Construction of the four-lane arch bridge over Sanuor&uuml; river would be completed within 12 months. This was stated by PWD (R&amp;B) south division executive engineer Vizotuo Seletsu, who is supervising the ongoing construction, during a media interaction at the site on Wednesday.<\/p>\n<p>Despite missing the deadline to complete the two-lane arch Sanuor&uuml; bridge by March-April, the department and contractors expressed the confidence that the four-lane arch bridge would be completed within the 12 months. Earlier on November 25, 2019, contractors KC Angami and Vilelie Khamo assured chief minister Neiphiu Rio that the two-lane road would be completed by March-April 2020, while the four-lane bridge would be completed and handed over before the 2020 Hornbill Festival.<\/p>\n<p>It may be mentioned that the bridge over Sanuor&uuml; stream was washed away during the 2016 monsoon season.<\/p>\n<p>During the media interaction, the executive engineer admitted that the department had failed to complete the two-lane bridge by April and attributed this to the poor condition of the Dimapur-Kohima road, due to which the materials could not be brought to the site on time, and lockdown owing to COVID-19 outbreak. However, he assured that irrespective of the monsoon or winter season, the department was committed in completing the bridge within one full working season.<\/p>\n<p>Explaining that arch was the heart of the bridge, he acknowledged that its construction was taking time and causing delay in the construction. He, however, assured that the two-lane arch would be completed by this month.<\/p>\n<p>Despite the work order having been issued on July 14, 2016, Seletsu said actual work of earth cutting began only on July 15, 2019. He asserted that finance was not a constraint and claimed that the contractors were giving priority in completing the project at the earliest.<\/p>\n<div>&nbsp;<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sanuor\u00fc bridge to be completed in 12 months<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[679],"tags":[],"class_list":["post-217850","post","type-post","status-publish","format-standard","hentry","category-nagaland-news"],"_links":{"self":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/217850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/comments?post=217850"}],"version-history":[{"count":0,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/217850\/revisions"}],"wp:attachment":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/media?parent=217850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/categories?post=217850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/tags?post=217850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}