{"id":27439,"date":"2017-09-23T01:02:14","date_gmt":"2017-09-23T01:02:14","guid":{"rendered":"http:\/\/151.106.38.4\/2017\/09\/23\/expedite-tender-process-for-sardp-project-ncsu\/"},"modified":"2017-09-23T01:02:14","modified_gmt":"2017-09-23T01:02:14","slug":"expedite-tender-process-for-sardp-project-ncsu","status":"publish","type":"post","link":"https:\/\/nagalandpost.net\/index.php\/2017\/09\/23\/expedite-tender-process-for-sardp-project-ncsu\/","title":{"rendered":"Expedite tender process for SARDP project: NCSU"},"content":{"rendered":"<p><img src=\/old_site\/><\/p>\n<div>Nagaland Contractors\u2019 &amp; Suppliers\u2019 Union (NCSU) has urged the state government and central ministry of transport and highway to expedite the process of inviting tender of SARDP Phase-I Project and ensure that local contractors were eligible to get the contract works under the programme.<\/div>\n<div>In a press release, NCSU president, Pele Khezhie, and general secretary, John Kath, expressed \u201cserious concern\u201d over the failure of the state government to implement the order ministry of transport &amp; highway, cancelling the work order in respect of Maytas- Gayatri, a Hyderabad based Joint Venture (JV) for construction of various roads under SARDP-I in Nagaland, which was allotted to the company on February 4, 2011.<\/div>\n<div>NCSU stated that Maytas-Gayatri (JV), instead of completing the said project, had abruptly abandoned the construction work since 2014 causing untold hardship to general public.<\/div>\n<div>The union also pointed out that it had on several occasions submitted representations urging the ministry of transport and highway to call for fresh tender for the construction of two-lane roads in the Nagaland under SARDP Phase-I i.e (1) Longleng-Changtongya Road (2) Mon-Tamlu, Merangkong Road (3) Phek-Pfutsero Road and (4) Zunheboto-Chakhabama Road.<\/div>\n<div>Further, NCSU said it had repeatedly reminded both the centre and state government for early restoration of the abandoned works and to change the modalities in awarding contract works by breaking-up into smaller projects in order to enable the local contractors to participate in the competitive bidding.&nbsp;<\/div>\n<div>Stating that the state government had \u201cexperienced the total failure of the so-called multi-crore company Maytas &amp; Gayatri in this project,\u201d NCSU said the same fate should not be repeated in the next bidding.<\/div>\n<div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Nagaland Contractors\u2019 &amp; Suppliers\u2019 Union (NCSU) has urged the state government and central ministry of transport and highway to expedite the process of inviting tender of SARDP Phase-I Project and ensure that local contractors were eligible to get the contract works under the programme. In a press release, NCSU president, Pele Khezhie, and general secretary, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[679],"tags":[],"class_list":["post-27439","post","type-post","status-publish","format-standard","hentry","category-nagaland-news"],"_links":{"self":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/27439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/comments?post=27439"}],"version-history":[{"count":0,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/posts\/27439\/revisions"}],"wp:attachment":[{"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/media?parent=27439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/categories?post=27439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nagalandpost.net\/index.php\/wp-json\/wp\/v2\/tags?post=27439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}