
Heavy landslides in four locations have blocked Pholami-Phek road along the ongoing construction of Pfutsero-Phek two-lane road under SARDP- NE. It was learnt that the retaining walls and brace walls had been completely damaged besides laid granular sub base (GSB) from 41+ 600km to 41+700 km chainage.
